180 George Parramatta
Parramatta, Sydney  ·  Mixed Use Residential  ·  Design Management & Site Delivery

Parramatta, Sydney

Senior design management across twin towers of 67 and 60 levels — including a 5-level basement with secant pile wall retention and tension anchors, leading engineering site delivery throughout.

All Projects
Project Snapshot
SectorMixed Use Residential
Tower67 and 60-level towers
Retaining Wall5-level basement, secant pile wall
FoundationTension anchors
RoleDesign Management — Superstructure & Substructure. Leading Engineering Site Delivery
DeveloperMeriton
ArchitectMeriton
Structural EngineerABC Consulting
Project StatusProject complete

Senior design management and leading engineering site delivery across twin 67 and 60-level towers with a deep basement.

180 George is a landmark twin-tower mixed-use development on the Parramatta River, comprising towers of 67 and 60 levels above a 5-level basement with secant pile wall retention and tension anchor foundations. The development is one of the tallest residential projects in Western Sydney.

Maple Consults provided senior design management across both the superstructure and substructure, leading engineering site delivery throughout the basement and tower phases. The scale and complexity of the project required precise coordination across structural, geotechnical and construction disciplines, with Maple Consults playing a central role in resolving design interfaces and maintaining programme across both towers simultaneously.

Key Challenges
  • Twin high-rise tower coordination
  • 5-level basement with secant pile wall
  • Tension anchor foundation system
  • Large-scale consultant coordination
  • High-density urban site
  • Programme and procurement pressures
  • Simultaneous substructure and superstructure delivery
Maple Consults Involvement
  • Senior design management — superstructure and substructure
  • Leading engineering site delivery
  • Consultant coordination
  • Basement and foundation management
  • Programme interface management
  • High-rise delivery support