The Esplanade Surfers Paradise
Surfers Paradise  ·  Mixed Use / Hotel & Apartments  ·  Design Management

Surfers Paradise, Gold Coast

Design management and basement strategy across a beachfront mixed-use redevelopment — transitioning an existing DWall and imported HD steel structure into a revised staged donut slab methodology.

All Projects
Project Snapshot
SectorMixed Use — Hotel & Apartments
Retaining Wall7-level basement, permanent water cut-off, D-Wall, designed top-down, likely donut slab construction
FoundationLarge diameter bored piles under fluid, large HD steel plunge columns, precast plunge columns
RoleDesign Management — Basement & Tower. Delivery Support
DeveloperAltus Property Group
ArchitectDBI Architects
Structural EngineerHera
Project StatusPiling works complete — excavation yet to start

Transitioning an existing top-down basement into a practical staged donut slab methodology.

The Esplanade is a major proposed beachfront hotel and apartment development at Surfers Paradise. The redevelopment incorporates an existing multi-level basement and diaphragm wall retention structure originally designed for full top-down construction using large hot-rolled HD steel sections imported from Europe.

Maple Consults provided design management and basement strategy support — transitioning the original top-down solution into a revised staged donut slab methodology, developing the excavation sequencing strategy and integrating the existing basement infrastructure into the updated development scheme. The core challenge was working within an existing partially constructed basement designed around a methodology no longer viable, and developing a buildable alternative within the constraints of the existing DWall system and imported steel sections already in place.

Key Challenges
  • Existing DWall retention system in place
  • Original top-down methodology no longer viable
  • Imported HD steel sections already installed
  • Donut slab staging within existing basement constraints
  • Deep excavation sequencing strategy
  • Redesigned tower scheme integration
  • Complex beachfront site conditions
  • Design coordination across multiple disciplines
Maple Consults Involvement
  • Design management — basement and tower
  • Basement strategy — top-down to donut slab transition
  • Excavation sequencing
  • Existing basement integration
  • Consultant coordination
  • Delivery strategy support